CG Peri Up Cantiliver Solutions

Home / Contracting / Scaffolding

Nav CMS - a big picture

CG Peri Up Cantiliver Solutions

Cantilever solutions

Vertical standards and first layer of horizontal ledgers. Choose your working height and place second layer of horizontal ledgers. All Connections are Secure, Calculable Standard Connections Safety Lock Prevention of Falling Objects, Time & Labor Saving Erection & Dismantling Processes Over Material Life Span.

(Average of 10 -12 Years) Crane Lifting of Complete Units Possible (e.g. Stair Towers, Shoring Towers, Birdcages)

95% of System Components are Below 10 kgs.

Approved International Method Statements of Erection & Dismantling

  • Material can be reduced

  • Smaller footprints can be used for load transfer

  • All components are standard items

  • Higher Loads can be Transferred Through Reduction of Leg Spacing